Case Study|8 May 2024

Zero utilities downtime with their ETL processes and data migration testing

Download

Aiming to provide carbon-free electricity by 2050, this utilities provider struggled to manage all the legal documentation for their wind farms.

Qualitest conducted an initial assessment of the Client’s existing ETL process, and recommended the following testing solutions:

  • System integration tests
  • Manual performance tests
  • User acceptance tests
  • And more

Download this case study to unlock the full story and see how Qualitest transformed this utilities provider’s ETL testing.

Download this Case Study

selected-download-image